Мы поможем в написании ваших работ!



ЗНАЕТЕ ЛИ ВЫ?

Technical requirements to the terminator of overstrain 330 kV

Поиск
Technical descriptions Requirements of Customer Offered Participant
1. General technical descriptions    
1.1 Standard GOST 52725-2007, operating standards of IEC  
1.2 Manufacturer *  
1.3 Conditional denotation (brand) *  
1.4 Most working tension is in an electric network, kV    
1.5 Nominal tension kV    
1.6 Most possible protracted working tension,kV    
1.7 Nominal bit current, kA    
1.8 Class of digit of line on IEC    
1.9 Specific power-hungryness, kDzh/Kv    
2. Value of climatic factors of external environment:
2.1 Category of placing (GOST 15150-69)    
2.2 Range of workings temperatures, °С from -32 to +40  
2.3 Thickness of wall of ice-storm, mm    
2.4 Possible speed of wind in the conditions of ice-storm, m/s    
2.5 Possible speed of wind in the conditions of absence of ice-storm, m/s    
2.6 Height above a level exterminating, m    
2.7 Seismic stability, marks on the scale of MsK-64    
2.8 Level of contamination of atmosphere in the district of placing of substation on the standard of MEK 60815-2008: "С"  
2.9 Specific pathlength loss of external isolation, "phase-earth" measured at tension, mm/kV    
3. Requirement to electric durability of isolation:
3.1 Remaining tension, kV, no more:    
3.1.1 · at the impulse of current (1/2 mcsec) of 10 kA    
3.1.2 · at the interconnect impulse of current (30/60 mks) of 1 kA    
3.1.3 · at the interconnect impulse of current (30/60 mks) of 2 kA    
3.1.4 · at a thunderstorm impulse of current (8/20 mks) of 5 kA    
3.1.5 · at a thunderstorm impulse of current (8/20 mks) of 10 kA    
3.1.6 · at a thunderstorm impulse of current (8/20 mks) of 20 kA    
3.2 Through current of shorting circuit, kA:    
3.2.1 Firmness to the currents of shorting circuit, kA    
3.2.2 Duration of short circuit on earth, sec    
4. Requirements to the construction, making and materials:
4.1 Type of grounding neutrally Deafly grounding  
4.2 A possible pull of wires is in horizontal direction,    
4.3 External isolation (material/color of coverage) polymer (preferably white)  
4.4 Power contact conclusion Aluminium  
4.5 Presence of impulsive meter with possibility of measuring of current of loss Yes  
4.6 Isolated basis for setting of meter of wearing-outs Yes  
4.7 Structural implementation Explosion fire safely  
4.8 Connecting possibility to ACS (to the subsystem of monitoring of power equipment) with control of the followings parameters:  
4.8.1 · Registration of wearing-outs is TOO; Yes  
4.8.2 · Fixing of time of wearing-out; Yes  
4.8.3 · Fixing of value of impulse of current of passing through TOO Yes  
5. Requirements on reliability:
5.1 Term of service, years,    
5.2 Guarantee term:    
5.2.1 · from the moment of putting into an operation, years    
5.2.2 · from the moment of reception-transmission on storage of Customer, years 5,5  
6. Completeness of terminators of overstrains
6.1 Terminator of overstrain in assembling in obedience to the list of acquisition Yes  
6.2 Screening rings for protecting from corona effect and providing of equitability tension on length Yes  
6.3 System of monitoring of the state TOO with possibility of remote read-out Yes  
6.4 Operating document in Russian or Ukrainian language.: Yes  
6.5 Technical passport On every TOO  
6.6 Assembly instruction and drafts and to exploitation 1 part on TOO  
6.7 List of acquisition On every TOO  
6.8 Protocols of test on a factory-producer On every TOO  

(*) - parameters must be given a producer

 

Technical requirements to the terminator of overstrain 110 kV

Technical descriptions Requirements of Customer Offered Participant
1. General technical requirements    
2. Standart GOST 52725-2007, operating standards of IEC  
3. Manufacturer *  
4. Conditional denotation (brand) *  
5. Type of grounding of neutrality Deafly earthed  
6. Nominal tension of network, kV    
7. Most working tension is in an electric network, kV    
8. Nominal tension is TOO, kV    
9. Most possible protracted working tension, kV    
10. Nominal bit current 8/20 mcsec, kA    
11. Class of digit of line concordantly IEC    
12. Specific power-hungryness, kDzh/kV 2,5  
13. Firmness at the current of shorting circuit (0,2 with), kA    
2. Requirement to electric durability of isolation:
2.1 Remaining tension, kV, no more:    
2.1.1 · at the impulse of current (1/2 mcsec) of 10 kA    
2.1.2 · at the interconnect impulse of current (30/60 mcsec) of 1 kA    
2.1.3 · at the interconnect impulse of current (30/60 mcsec) of 2 kA    
2.1.4 · at a thunderstorm impulse of current (8/20 mcsec) of 5 kA    
2.1.5 · at a thunderstorm impulse of current (8/20 mcsec) of 10 kA    
2.1.6 · at a thunderstorm impulse of current (8/20 mcsec) of 20 kA    
3. Value of climatic factors of external environment:
3.1 Category of placing (GOST 15150-69)    
3.2 Range of workings temperatures, °С from -32 to +40  
3.3 Thickness of wall of ice-storm, mm    
3.4 Possible speed of wind in the conditions of ice-storm, m/sec    
3.5 Possible speed of wind in the conditions of absence of ice-storm, m/sec    
3.6 Height above a level exterminating, m    
3.7 Seismic stability of district, marks on the scale of MsK-64, not less than    
3.8 Level of contamination of atmosphere in the district of placing of substation on the standard of MEK 60815-2008: "С"  
3.9 Specific pathlength loss of external isolation, "phase-earth" measured at tension, mm/kV    
4. Requirements to the construction, making and materials:
4.1 A possible pull of wires is in horizontal direction,    
4.2 External isolation (material/color of coverage) polymer  
4.3 Presence of electric meter with possibility of measuring of current of loss Yes  
4.4 Isolated basis for setting of meter of wearing-outs yes  
4.5 Power contact conclusion Aluminium under a clamp  
4.6 Structural implementation Explosion fire safely  
4.7 Connecting possibility to ACS (to the subsystem of monitoring of power equipment) with control of next parameters:  
4.7.1 Registration of wearing-outs is TOO; Yes  
4.7.2 Fixing of time of wearing-out; yes  
4.7.3 Fixing of value of impulse of current of passing through TOO yes  
5. Requirements on reliability::
5.1 Term of service, years, not    
5.2 Guarantee term:    
5.2.1 · from the moment of putting into an operation, years, not less than    
5.2.2 · from the moment of reception-transmission on storage of Customer, years, not less than 5,5  
6. Completeness of terminators of overstrains
6.1 Terminator of overstrains in collection in obedience to the list of acquisition Yes  
6.2 Screening rings for protecting from koronirovaniya and providing of equitability tension on length Yes  
6.3 System of monitoring of the state TOO with possibility of remote read-out yes  
6.4 Operating document in Russian or Ukrainian language.: Yes  
6.5 Technical passport On every TOO  
6.6 Assembly instruction and drafts and to exploitation 1 part on TOO  
6.7 List of acquisition On every TOO  
6.8 Protocols of test on a factory-producer On every TOO  

(*) - parameters must be given a producer

 

Technical requirements to the shield of own needs 0,4 kV

Technical descriptions Requirements of Customer Offered Participant
14. Standart GOST 52725-2007, operating standards of IEC  
15. Manufacturer *  
16. Power    
17. Nominal tension, kV 0,4  
18. Nominal working current of tires, kA *  
19. Climatic execution ?  
20. Closet of input 0,4 kV 2 things  
21. Requirements of exploitation Two-sided  
22. Presence of rolling out elements With the pulled out elements  
23. Sectional closet 0,4 kV 1 things  
24. Closet of outgoing lines 0,4 kV No less than 2 things  
25. Type of joinings Cable  
26. Amount of the outgoing cable joinings In accordance with an of principle chart  
27. Charts of main chains In accordance with an of principle chart  
28. Presence of comptroller with the capacity of connecting for ACS Yes  
29. Operating document in Russian or Ukrainian language. Yes  
30. · Technical passport Yes  
31. · Assembly instructions and drafts and to exploitation Yes  
32. · List of acquisition Yes  
33. · Protocols of test on a factory-producer Yes  
34. · Certificate of accordance Yes  
35. •List of SIB yes  

(*) - Parameters must be given a producer.

 

 



Поделиться:


Последнее изменение этой страницы: 2016-08-06; просмотров: 312; Нарушение авторского права страницы; Мы поможем в написании вашей работы!

infopedia.su Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав. Обратная связь - 52.14.88.137 (0.007 с.)