Load-lifting mechanisms and accessories 


Мы поможем в написании ваших работ!



ЗНАЕТЕ ЛИ ВЫ?

Load-lifting mechanisms and accessories



 

The Contractor shall own or have guaranteed access (by means of rent, leasing, sales contract, availability of production facilities or otherwise) in the Employer's country to all load-lifting mechanisms and accessories, to perform load-lifting works during transportation of the equipment and structures to their storage area and/or the construction site.

 

The Contractor shall guarantee that this equipment is in fully operable condition, meets the technical requirements and the Contractor shall also prove that this equipment will be available for him during the entire period of the Contract's implementation.

 

Availability of the equipment shall be confirmed by ownership certificate or letter of commitment from the owner.

 

Strapping of cargos shall be performed by inventory slings. Strapping methods shall exclude possibility of falling or sliding of strapped cargo.

Strapping of installation components shall be performed in the points specified in the detailed drawings. Strapping method of the integrated flat and spatial blocks shall provide durability, stability and invariability of geometrical forms during their lifting. Strapping of structures at random points, as well as by outstanding armature parts is for Tenderden.

Placement of cargo on vehicles shall ensure steady position of cargo during transportation and unloading.

 

Before lifting of each assembly element, it is necessary to check the following:

· element's conformity to the design type;

· condition of embedded parts,absence of dirt and damages on finished surfaces, integrity of primer coating and painting;

· presence of necessary fasteners and auxiliary materials at workplace;

· correct and reliable fastening of load-gripping devices.

 

During installation of assembly elements, the following shall be ensured:

· stable and fixed position at all erection stages;

· safety of work performance;

· accuracy of their position (by means of permanent geodesic control);

· strength of assembly joints.

 

The installation assembly elements shall be reliably fixed before removal of slings.

 

Warranty

 

The Contractor shall guarantee reliable operation of all delivered and Contractor-installed equipment for at least during the period required by the Employer for each type of the equipment as per the Technical Requirements (see Technical Data Sheets).

 

Warranty period must be:

· for the terminators of overstrain 330 kV, 110 kV - no less than 5-ti years from the day of putting into an operation or 5,5 years from the date of receipt on storage of Customer;

· for bus supports 330 kV, 110 kV - no less 3th from the day of putting into an operation or 3,5 years from the date of receipt on storage of Customer;

· for GIS-330 kV, GIS-110 kV – no less 2th from the day of putting into an operation or 3 years from the date of receipt on storage of Customer;

 

A guarantee period for works must be no less than 10 years.

 

During this warranty period, the Contractor at its own expense shall eliminate all defects and repair any part of the equipment, which has been properly installed and has been in operation, but has failed due to structural defects or production defect.

 

During the warranty period, defects shall be eliminated by the Contractor within not more than 1.5 months from the date of receipt of written notification from the Employer.

 

The Contractor shall bear all direct responsibility for equipment defects, the Contractor shall provide all necessary measures in order to provide commissioning and full operability of the site, according to the Contract's terms and conditions. The warranty period for works shall be not less than 10 years.

 

The Contractor shall provide integrity of the entire complex, even if some necessary equipment or services had not been particularly described in these technical requirements.

 

General layout and transportation system; Access roads at the site

 

Existent SS-330/110 kV «October» is located in town Kiev in the street Stecenka 1a. Dwelling building is from every quarter located substation. SS has a long term of exploitation, as a result of which the set equipment is moral and physically outdated and requires replacement.

 

Placing of new buildings is determined the terms of existent SS and technological connections with OSS. Version of reconstruction does not require expansion of territory of substation.

 

From a north side to the ground of substation an entrance motorway calls with concrete coverage. Reconstruction existing OSS(Outdoor switching substation) -330 kV, OSS-110 kV planned within the limits of existent ground of SS.

 

Relief of ground is in the places of implementation of works – quiet. Absolute marks hesitate within the limits of 173,5 – 177m.

 

In connection with building of new buildings dismantling of part of existent protection of SS and building of new is foreseen.

 

Inspection and tests

All equipment and materials used for contractual works shall be factory-inspected and factory-tested, according to the requirements of the codes and standards.

 

The Employer's representatives may witness the inspection and tests of the equipment and materials. The Contractor shall notify the Employer on the time of inspection and tests of the equipment as per the procedure stipulated in the Contract.

 

Factory tests and factory test reports

 

The factory-build structures and equipment shall be completely assembled, adjusted and inspected at manufacturer's factory.

 

Simultaneously with delivery of the equipment, the Contractor shall submit to the Employer the factory test reports, which confirm the quality and technical characteristics of the equipment.

 

The Contractor shall ensure compliance of factory test reports, certificates and other necessary documentation delivered with equipment, with the requirements of the current Ukrainian codes and standards.

 

The Contractor shall bear all cost of the FAT.

 

 

Site tests

 

After installation of the equipment, the Contractor shall perform setting-up, checking, tests and commissioning of the equipment according to the programs agreed with the Employer.

 

The Contractor shall prepare test programs on the basis of manufacturer's instructions, considering the requirements of SOU-N ЕЕ 20.302: 2007 and shall be submitted to the Employer for approval, three months prior to the tests.

 

The Contractor shall carry out tests of the assembled and installed equipment according to the requirements of SNiP III-4-80, part III "Rules of manufacture and acceptance of works", SOU-N ЕЕ 20.302:2007 "Electrical equipment test standards", rules and instructions confirmed by government supervision authorities, as well as according to manufacturer's operational instructions on this equipment.

 

Prior to equipment individual tests, the Contractor shall ensure health and safety rules by performing the following preparatory works:

 

a) work supervisor shall instruct the test personnel on the procedure of work execution and on necessary actions for their safe performance;

b) visual inspection, using instrumentations if necessary, of equipment fastening, condition of insulation and grounding of electrical elements, presence and operability of fittings, starting and stopping devices, test-instrumentation and plugs;

c) protection of test area with its marking using corresponding signs;

d) provision of emergency shutdown of the equipment being tested;

e) checking for absence of foreign objects inside and outside of the equipment;

f) assignment points and conditions of safe presence of persons involved in the tests;

g) bringing into the state of readiness of fire-extinguishing means and personnel capable to eliminate possible fire;

h) provision of lighting of workplaces, not less than 50 lux;

i) assignment of persons responsible for safe work performance, in accordance with the test program.

 

It is allowed to start equipment test only after timely notification of nearby standing persons and receiving the permission from the test supervisor.

 

During the equipment tests, the following actions are not allowed:

 

а) removal of safety barriers;

б) cleaning and greasing the equipment, touching its moving parts;

в) inspection and correction of electric circuits, electric equipment and automation devices.

 

Elimination of defects/malfunctions on the equipment, if found out during tests, shall be made after its disconnection from mains and at full stop. If any test result at the installation site does not meet the technical requirements, or if the equipment does not comply with guaranteed performance parameters, the Employer has the right to reject from acceptance of the equipment and request its replacement.

 

Fire safety

GIS 330 kV and 110 kV on SS projected for the I degrees of fire-resistance. Gis 330 kV and 110 kV concordantly NAPB 06.015-2006, category on explosive and fire hazard of apartments - "D". For every building there must be no less than two outputs. Width of passage-ways for the ways of evacuation is accepted no less than a 1,0 m, width of doors - no less than 0,8 m.

 

In the apartment of storage batteries SCR, the pressurized accumulators, selecting the very negligible quantity of hydrogen in the mode of subcharge and boosting battery, are set. Taking into account permanent operating system of natural reveal-drawing ventilation and dissolution of concentration of hydrogen, this concentration can not attain explosive indexes. The apartment of storage batteries is subsumed «D».

 

External fire-fighting system is provided from existing on SS of the circular plumbing with fire-cocks.

Internal fire-fighting system from fire faucets is not used. For apartments foreseen only primary facilities of fire-fighting.

 

The gasket of cable is executed taking into account the requirements of gl.2.3 PUE. Concordantly NAPB 05.031-2010 in cable trays through 50 m, and also in the places of branches fire-prevention belts are foreseen from sand.

 

Fireproof cable passage-ways are foreseen through build constructions with the limit of fire-resistance no less EI60, compression of openings round pipes, cables - with the limit of fire-resistance no less EI60 concordantly p.3.16 SNiP 3.05.06.-85, p.10.5 NAPB V.01.056-2005/iii.

 



Поделиться:


Последнее изменение этой страницы: 2016-08-06; просмотров: 322; Нарушение авторского права страницы; Мы поможем в написании вашей работы!

infopedia.su Все материалы представленные на сайте исключительно с целью ознакомления читателями и не преследуют коммерческих целей или нарушение авторских прав. Обратная связь - 18.191.234.62 (0.015 с.)